Welcome to the official website of Jiangsu Hengyi Transformer Co., Ltd.!
How is the oil immersion transformer inspection cycle time? The lower transformer manufacturers introduce you to the small partners who are interested in, take time to find out!
1. Overhaul cycle:
10 years after the funding is running, it is overhaul once.
The transformer in the run is discovered by anomalous or experimental judgment to overhaul when there is an internal common problem.
When the failure of the import and export is frequently fault, it should be fully amended.
Safety production accident drain cells were eliminated once.
2. Overhauling cycle (should be assigned to every year of autumn, or when the line is terminated):
Power station oil immersed main changes should be awarded each year.
3. The service cycle of the subsidiary machinery:
Maintenance facilities and temperature detection of the verification of the machine equipment, every year.
Refrigeration fan motor melting repair, every year.
Check the equipment and control loop. Check. Clear, every year.
4. There is an overhaul cycle with a separate power switch:
When sampled, the finished oil is found to be removed from the standard when the finished oil is lower than the standard. Even if the oil compressive strength exceeds 30kV, new oil should be replaced once every year.
The new fund allocation running has a separate power switch in transform 5000 or not to ensure 5,000 times but after the operation is over 1 year, the transform should be taken out.
When the operation process is over 50000, it can handle the switching switch. After the power switch is five years, it should be maintained for 50,000 times.
5. Power capacitor rigid waterproof casing:
The electrical equipment test and the aging of rubber products should be established.